desludging-wwtp-ponds

Desludging WWTP Ponds

Client:

Meat processor / Red meat abattoir

Industry:

Wastewater

Location:

New South Wales, Australia

Key Issues:

Sludge Removal
Anaerobic Pond
EPA required increase to hydraulic capacity

Project Summary:

Abattoir wastewater system

Anaerobic, aerobic and finishing pond system (7 in total)

Challenge:

1. 600mm scum layer of FOG (Fats, Oils and Grease) on anaerobic pond 2. Anaerobic pond required desludging- mechanical desludging was cost prohibitive 3. Sludge causing low hydraulic load- EPA required increase 4. Poor water quality 5. Poor treatment efficiency

Results:

Anaerobic pond no longer required mechanical desludging

Surface scum reduced to 5-10mm and surface became ‘healthy again’

Aerobic pond had less sludge

All ponds operating clearer

Odour reduction noticeable in ponds and recycled water

Wastewater lagoons