Project Summary:

Trial of the effects of our product on Total Suspended Solids in digesters

Our product was added to one of 2 (30,000L) digester tanks with identical sludge for 30 days

NATA testing was conducted before and after the trial period on both tanks

Challenge:

High levels of TSS lead to sludging in the digesters

Results:

9.47% more TSS removed from the digester with our product added

Product accelerates the breakdown of sludge in just 30 days