Client:
Tourism Resort
Industry:
Wastewater
Location:
Queensland, Australia
Key Issues:
Total Suspended Solids
Project Summary:
Trial of the effects of our product on Total Suspended Solids in digesters
Our product was added to one of 2 (30,000L) digester tanks with identical sludge for 30 days
NATA testing was conducted before and after the trial period on both tanks
Challenge:
Results:
9.47% more TSS removed from the digester with our product added
Product accelerates the breakdown of sludge in just 30 days